Articles
June 22, 2026
Step-by-step instructions for replacing a bayonet fuse in a padmount transformer. Includes tools, safety procedures, and installation steps.
June 1, 2026
Transformer rewinding replaces damaged coils while keeping the original steel components. Save money, maintain your footprint, and cut lead times in half with Maddox.
May 20, 2026
When standard fusing reaches its capacity limits, you need a different way to protect your transformer. Learn how integrated vacuum interrupters compare to standalone switchgear for high-kVA applications.
May 11, 2026
Does your project need a liquid-filled or a dry-type transformer? Review the basics, locations, and common uses of both.
May 5, 2026
Maddox Industrial Transformer unveils its new Batavia Main Street Campus, a renovated fire station and three-building office hub revitalizing downtown.
May 4, 2026
Maddox is expanding its footprint in Battle Ground, Washington with a new office, warehouse, and storage yard.
April 27, 2026
Highland Electric needed a BABA-compliant padmount to power KWRL Transportation’s fleet of electric schoolbuses. But the industry lead time was forty-two weeks.
March 16, 2026
Learn how to install a low voltage dry-type transformer with this general guide covering wiring, primary tap settings, grounding, anchoring, and NEC compliance.
March 16, 2026
When EC Electric had project deadlines threatened by delayed transformers, they turned to Maddox. Read what happened next.